{"id":170375,"date":"2024-03-19T21:43:46","date_gmt":"2024-03-19T20:43:46","guid":{"rendered":"https:\/\/www.voyages-d-affaires.com\/?p=170375"},"modified":"2024-03-20T08:02:45","modified_gmt":"2024-03-20T07:02:45","slug":"renovating-the-brussels-paris-high-speed-line","status":"publish","type":"post","link":"https:\/\/www.voyages-d-affaires.com\/en\/renovating-the-brussels-paris-high-speed-line","title":{"rendered":"10 years of renovation for the Brussels-Paris high-speed line"},"content":{"rendered":"<p>Opened in 1997, <strong>the high-speed line between Brussels and France is the oldest high-speed rail network in Europe<\/strong>. LGV1\", the line linking Brussels to France, <strong>used every day by around a hundred trains<\/strong> travelling at 300km\/h, is showing signs of wear and tear.<\/p>\r\n\r\n\r\n\r\n<p>In recent years, signs of ageing have appeared, prompting Infrabel, the Belgian railway infrastructure manager, to plan a renewal project that will be spread over ten years at a cost of<span style=\"font-weight: 400\"> 310 million.<\/span><\/p>\r\n<p><strong>The first phase of the works will take place this summer<\/strong>. Their scale, and the need to guarantee staff safety, will make it impossible to keep the line in service. <strong>Traffic will be completely disrupted on the <a href=\"https:\/\/www.voyages-d-affaires.com\/en\/eurostar-image-marque-20231010.html\/\" target=\"_blank\" rel=\"noreferrer noopener\">TGV line<\/a> in both directions, from 12 to 30 August<\/strong>. During this period, TGVs will use the conventional network, either via Mons (traffic to and from Paris), or via Ath\/Tournai (traffic to and from London), resulting in <strong>journey times extended by around 30 minutes<\/strong>.<\/p>\r\n\r\n\r\n\r\n<figure class=\"release-content-image release-content-image--contained release-content-image--align-center\" data-component=\"image-zoom-popup\" data-image-zoom-popup-selector=\".release-content-image__image\" data-image-zoom-popup-i18n=\"data:application\/json;base64,eyJEb3dubG9hZCI6IkRvd25sb2FkIn0=\" data-image-zoom-popup-tracking-views-event=\"Story Image View\" data-image-zoom-popup-tracking-download-event=\"Story Image Download\" data-image-zoom-popup-placement=\"content\">\r\n<div class=\"image-thumbnail-rollover\">\u00a0<\/div>\r\n<\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image alignnone release-content-image__image image-thumbnail-rollover__image\"><img decoding=\"async\" src=\"https:\/\/cdn.uc.assets.prezly.com\/f379102f-66be-4296-8de3-3a50b9338ab4\/-\/resize\/1200x\/-\/format\/auto\/\" alt=\"\" \/>\r\n<figcaption class=\"wp-element-caption\"><em>During the works this summer, high-speed trains will pass via Mons or Tournai (Graphic: Infrabel)<\/em>.<\/figcaption>\r\n<\/figure>\r\n\r\n\r\n\r\n<div class=\"image-thumbnail-rollover__caption\">\u00a0<\/div>\r\n\r\n\r\n\r\n<p>The planning of the project has taken into account the organisation of the Olympic Games in Paris. The launch will therefore take place after the closing ceremony. <strong>The various rail operators operating on this LGV 1 have adapted their timetables accordingly<\/strong>. Eurostar will shortly be informing passengers of the timetable changes.<\/p>\r\n\r\n\r\n\r\n<h3 id=\"h-des-travaux-chaque-ete-jusqu-en-2035-avec-interruption-du-trafic\" class=\"wp-block-heading\">Work to be carried out every summer until 2035, with traffic disruption<\/h3>\r\n\r\n\r\n\r\n<p>In 18 days and 18 nights, the technical teams will be completely renewing the components of one of the two lanes. That's a 17.6km stretch. This will mean laying 35.2km of new rails, around 30,000 new sleepers and some 5,500 tonnes of ballast.<\/p>\r\n\r\n\r\n\r\n<p>According to Infrabel, <strong>renovation work on LGV 1 \"Brussels-French border\" will continue until 2035<\/strong>. Until then, this will mean <strong>planned traffic cuts every summer<\/strong>. On average, around fifteen days a year.<\/p>","protected":false},"excerpt":{"rendered":"<p>Belgian railway company Infrabel is launching the renovation of the Brussels-Paris high-speed line, scheduled to run until 2035. The first effects on journey times will be felt from August onwards.<\/p>","protected":false},"author":21,"featured_media":170391,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[61],"tags":[1075,1449],"type-darticle":[52],"n_magazine":[],"class_list":["post-170375","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ferroviaire","tag-belgique","tag-eurostar","type-darticle-breve","vapo-free"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.9 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Des ralentissements pour les TGV entre Bruxelles et Paris<\/title>\n<meta name=\"description\" content=\"10 ans seront n\u00e9cessaires pour la modernisation et r\u00e9novation de la ligne TGV entre Bruxelles et la France.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.voyages-d-affaires.com\/en\/renovating-the-brussels-paris-high-speed-line\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"10 ans de r\u00e9novation pour la ligne \u00e0 grande vitesse Bruxelles-Paris\" \/>\n<meta property=\"og:description\" content=\"10 ans seront n\u00e9cessaires pour la modernisation et r\u00e9novation de la ligne TGV entre Bruxelles et la France.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.voyages-d-affaires.com\/en\/renovating-the-brussels-paris-high-speed-line\" \/>\n<meta property=\"og:site_name\" content=\"Voyages d&#039;affaires\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-19T20:43:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-20T07:02:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"700\" \/>\n\t<meta property=\"og:image:height\" content=\"394\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Luc Citrinot\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luc Citrinot\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris\",\"url\":\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris\",\"name\":\"Des ralentissements pour les TGV entre Bruxelles et Paris\",\"isPartOf\":{\"@id\":\"https:\/\/www.voyages-d-affaires.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg\",\"datePublished\":\"2024-03-19T20:43:46+00:00\",\"dateModified\":\"2024-03-20T07:02:45+00:00\",\"author\":{\"@id\":\"https:\/\/www.voyages-d-affaires.com\/#\/schema\/person\/c74b2eea412d55da7482e81e95f8edc3\"},\"description\":\"10 ans seront n\u00e9cessaires pour la modernisation et r\u00e9novation de la ligne TGV entre Bruxelles et la France.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#primaryimage\",\"url\":\"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg\",\"contentUrl\":\"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg\",\"width\":700,\"height\":394,\"caption\":\"La r\u00e9novation de la ligne \u00e0 grande vitesse entre la Belgique et la France devrait prendre une dizaine d'ann\u00e9es.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.voyages-d-affaires.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"10 ans de r\u00e9novation pour la ligne \u00e0 grande vitesse Bruxelles-Paris\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.voyages-d-affaires.com\/#website\",\"url\":\"https:\/\/www.voyages-d-affaires.com\/\",\"name\":\"Voyages d&#039;affaires\",\"description\":\"media fran\u00e7ais du Voyage d&#039;Affaires &amp; du MICE\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.voyages-d-affaires.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.voyages-d-affaires.com\/#\/schema\/person\/c74b2eea412d55da7482e81e95f8edc3\",\"name\":\"Luc Citrinot\",\"url\":\"https:\/\/www.voyages-d-affaires.com\/en\/author\/luccitrinot\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Slowdowns for TGV trains between Brussels and Paris","description":"It will take 10 years to modernise and renovate the TGV line between Brussels and France.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.voyages-d-affaires.com\/en\/renovating-the-brussels-paris-high-speed-line","og_locale":"en_GB","og_type":"article","og_title":"10 ans de r\u00e9novation pour la ligne \u00e0 grande vitesse Bruxelles-Paris","og_description":"10 ans seront n\u00e9cessaires pour la modernisation et r\u00e9novation de la ligne TGV entre Bruxelles et la France.","og_url":"https:\/\/www.voyages-d-affaires.com\/en\/renovating-the-brussels-paris-high-speed-line","og_site_name":"Voyages d&#039;affaires","article_published_time":"2024-03-19T20:43:46+00:00","article_modified_time":"2024-03-20T07:02:45+00:00","og_image":[{"width":700,"height":394,"url":"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg","type":"image\/jpeg"}],"author":"Luc Citrinot","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Luc Citrinot","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris","url":"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris","name":"Slowdowns for TGV trains between Brussels and Paris","isPartOf":{"@id":"https:\/\/www.voyages-d-affaires.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#primaryimage"},"image":{"@id":"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#primaryimage"},"thumbnailUrl":"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg","datePublished":"2024-03-19T20:43:46+00:00","dateModified":"2024-03-20T07:02:45+00:00","author":{"@id":"https:\/\/www.voyages-d-affaires.com\/#\/schema\/person\/c74b2eea412d55da7482e81e95f8edc3"},"description":"It will take 10 years to modernise and renovate the TGV line between Brussels and France.","breadcrumb":{"@id":"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#primaryimage","url":"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg","contentUrl":"https:\/\/www.voyages-d-affaires.com\/wp-content\/uploads\/2024\/03\/eurostar-red.jpg","width":700,"height":394,"caption":"La r\u00e9novation de la ligne \u00e0 grande vitesse entre la Belgique et la France devrait prendre une dizaine d'ann\u00e9es."},{"@type":"BreadcrumbList","@id":"https:\/\/www.voyages-d-affaires.com\/en\/renover-ligne-grande-vitesse-bruxelles-paris#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.voyages-d-affaires.com\/"},{"@type":"ListItem","position":2,"name":"10 ans de r\u00e9novation pour la ligne \u00e0 grande vitesse Bruxelles-Paris"}]},{"@type":"WebSite","@id":"https:\/\/www.voyages-d-affaires.com\/#website","url":"https:\/\/www.voyages-d-affaires.com\/","name":"Business travel","description":"THE FRENCH BUSINESS TRAVEL &amp; MICE MEDIA","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.voyages-d-affaires.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.voyages-d-affaires.com\/#\/schema\/person\/c74b2eea412d55da7482e81e95f8edc3","name":"Luc Citrinot","url":"https:\/\/www.voyages-d-affaires.com\/en\/author\/luccitrinot"}]}},"_links":{"self":[{"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/posts\/170375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/comments?post=170375"}],"version-history":[{"count":10,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/posts\/170375\/revisions"}],"predecessor-version":[{"id":170397,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/posts\/170375\/revisions\/170397"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/media\/170391"}],"wp:attachment":[{"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/media?parent=170375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/categories?post=170375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/tags?post=170375"},{"taxonomy":"type-darticle","embeddable":true,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/type-darticle?post=170375"},{"taxonomy":"n_magazine","embeddable":true,"href":"https:\/\/www.voyages-d-affaires.com\/en\/wp-json\/wp\/v2\/n_magazine?post=170375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}